CE2C SAS

ce2c sas
Our areas of activity

Civil Engineering, Water & Sanitation, Transport Infrastructure (roads, bridges, tunnels), Buildings, Hydro-agricultural development, Environment and sociology, Project Management, Renewable Energy, Audits, etc.

+229 01 40 51 78 38 | +229 01 90 98 75 80

cecc@cecc-ing.com | ce2c2022@gmail.com

Island 191 plot k – Zopah – ABOMEY-CALAVI

REALISATION DES ETUDES D’EXECUTION DANS LE CADRE DES TRAVAUX DE REHABILITATION ET D’AMENAGEMENT DES VOIRIES DANS LES VILLES DU BENIN : ASPHALTAGE PHASE B2 : VILLES DE COTONOU, (LOT 3B : COTONOU) ET DE REMPLACEMENT/REMISE EN ETAT DE GRILLES AVALOIRS, TAMPONS DE REGARDS ET DALLETTES DE CANIVEAUX DANS LES VILLES DE CALAVI, COTONOU ET SEME-PODJI

YearSeptembre 2024 – en cours
CustomerSTECOL
Project Owner / Delegated Project OwnerSIRAT SA
CountryBenin

Role in the mission

Subcontracting contract for the technical studies of execution

The project concerns

  • Sizing of 10,125 km de voiries bitumées ou pavées
  • Sizing of 22 km de caniveaux latéraux
  • Geometric design (plan view, long profile, cross profiles of the layouts)
  • Development of the standard plans
  • Sizing of the various works accompanied by calculation notes and formwork and reinforcement plans
  • Sizing of the pavement structure
  • Carrying out hydrological and hydraulic studies
  • Implementation of road signage plans