COMPLETION OF EXECUTION STUDIES AS PART OF THE BEACH DEVELOPMENT WORK BETWEEN MARIE-STELLA AND ADOUNKO (12.5 KM)
YearMarch 2023 – in progress
CustomerHITECH-ITB BENIN
Project Owner / Delegated Project OwnerSIMAU SA
CountryBenin
Role in the mission
Subcontracting contract for the technical studies of execution
The project concerns
- The development of a walk between Marie-Stella and Adounko
- The extension of the existing driveway
- The arrangement of car parks
- The development of the banks of the channel and retention basins
- The development of ramps and tracks
- Extension of SONEB (AEP), SBEE (HTA, BT), SBIN networks (Optical fiber)
- Geometric design (plan view, long profile, cross profiles of the layouts)
- Development of the standard plans
- Hydrological and hydraulic studies accompanied by drainage plans
- Sizing of the various works accompanied by calculation notes and formwork and reinforcement plans
- Sizing of the pavement structure
- Elaboration des plans d’implantation des massifs et de la note de dimensionnement des massifs et tige d’ancrage
- Studies on the movement of existing networks (AEP, ELECTRICITY, TELECOMS)
- Implementation of road signage plans
- Development of the Construction Site PGES